S.R. 2011
This is the replacement of a single span structure carrying SR 2011 (Martindale Road) over
Plum Run on the same alignment with minimal roadway approach work and other
miscellaneous construction.
Hardt Road Bridge
Replacement of Bridge WB-415 at Milepost 37.46, Hardt Road over Pennsylvania
Turnpike, Allegheny County, PA / Responsible for providing Design/Build final design
services for the replacement of the existing Hardt Road Bridge over the Pennsylvania
Turnpike with a new 229’ two-span, pre-stressed concrete I-beam bridge.
S.R. 2028
This is the replacement of a single span structure carrying SR 2028 on the same
alignment with minimal roadway approach work
S.R. 1022
WEI performed the design for SR 1022 in New Brighton Borough as part of a design/build
project in district 11-0.  The project included a con-span culvert, a retaining wall,
guide-rail upgrade and roadway reconstruction.
Hulton Road Bridge
Replacement of Bridge WB-445 at Milepost 48.80, Hulton Road over Pennsylvania
Turnpike, Allegheny County, PA / Responsible for providing Design/Build final design
services for the replacement of the existing Hulton Road Bridge over the Pennsylvania
Turnpike with a new 252’ two-span, steel girder bridge utilizing staged construction.